Putnam County Economic Development

Available Site

71.0 Acres

Columbus Grove Southside Industrial Park

 

Columbus Grove, Ohio

 

Latitude (40.543357)    Longitude  (-84.035092)   Elevation (773)

{Aerial View} {Topographic Map} {Map in Relation to 75} {Community Info}

Site Features

Maximum Available:

71.0 Acres

Asking Price:

$7,200 (negotiable)

Minimum Available:

3.0 acres

Zoning:

Industrial

Location: The Site is located on St. Rt. 65, 15 miles North of Lima, 22 miles South of Findlay, and 62 miles South of  Toledo. The Site is fully serviced with utilities (processed water, sanitary sewer, storm drainage, natural gas and electric) and is 7 miles from of a four lane highway (I-75). The Site is annexed into Columbus Grove, zoned "industrial", has a completed Phase 1 Environmental Study and available soil borings. It is within an Enterprise Zone and a Community Reinvestment Area. 


Utilities

Electric:

Midwest Electric

Location:

On Site

 

 

Primary Voltage:

12 kV

Gas:

Dominion East Ohio Gas

Location:

On Site

 

 

Main Size (in.):

6

 

 

Pressure (psi):

50

Telephone:

Columbus Grove Telephone

Switching:

Digital

 

 

Fiber Optic:

Yes

Water:

Village of Columbus Grove

Location:

On Site

 

 

Main Size (in.):

10

 

 

Pressure (psi):

52

Sanitary Sewer:

Village of Columbus Grove

Location:

On Site

 

 

Main Size (in.):

8

Storm Sewer:

Surface runoff and containment

Location:

On Site


Transportation

Airport:

Putnam County Airport

Distance (mi.):

8.0

Airport:

Toledo Commercial Airport

Distance (mi.):

70.0

Highway:

SRs 12 & 65 U.S. Route 30

Distance (mi.):

0.0

Interstate:

I-75

Distance (mi.):

9.0

Water Port:

Port Toledo

Distance (mi.):

70.0

Rail:

CSXT

Distance (mi.):

0.0

 

 

Siding:

Feasible


Taxes/Incentives

District:

Cols. Grove Corp./Cols Grove LSD/ Plea

Incentive Possible:

Yes

Real:

$48.72/$1000 @ 35%

 

 

Personal:

$48.72/$1000 @ 25%

 

 


Comments

Property partially annexed into Village of Columbus Grove, within enterprise zone and zoned industrial. Phase I environmental study and soil borings completed.

Revised Date: 06/09/069

{Home} {Incentives} {Development Sites} {State Programs} {Port Authority} {Industrial Guide} {Map}