Putnam County Economic Development

Available Site   

 16 Acres

 Iron Highway Industrial Park-Site 9

 

Leipsic, Ohio

 

Latitude: (41.11963)  Longitude: (-83.96778)

{Aerial Map} {Topographic Map} {Transportation Map} {Land Use Map} {Community Info}

Site Features

Maximum Available:

11 Acres

Asking Price:

$15,000

Minimum Available:

3.0 Acres

Zoning:

Industrial

Location: The Site is situated in the northern portion of Leipsic and bounded on the East by St. Rt. 65 and on the North by Township Rd. 5-D and on the East by the Leipsic Community Railroad.


Utilities

Electric:

American Electric Power

Primary Voltage:

69kV

 

 

Location:

On Site

Gas:

KNG Energy 

Location:

Adjacent

 

 

Main Size (in.):

8 in.

 

 

Pressure (psi):

100 lb.

 

Dominion East Ohio Gas

Location:

1500 ft.

 

 

Main Size (in.):

6 in.

 

 

Pressure (psi):

100 lb.

Telephone:

Fairpoint Communication

Switching:

Digital

 

 

Fiber Optic:

Yes

Potable Water:

Village of Leipsic

Location:

On Site

 

 

Main Size (in.):

12 in.

 

 

Pressure (psi):

61 lb.

Raw Water:

Village of Leipsic

Location:

2000 ft.

 

 

Main Size (in.):

16 in.

 

 

Pressure (psi):

80 lb.

Sanitary Sewer:

Village of Leipsic

Location:

On Site

 

 

Main Size (in.):

8 in.

Storm Sewer:

Surface runoff and containment

Location:

On Site


Transportation

Airport:

Putnam County Airport

Distance (mi.):

7.0 mi.

Airport:

Toledo Express Airport 

Distance (mi.):

45 mi.

Highway:

St. Rt. 65

Distance (mi.):

0.0

Interstate:

I-75

Distance (mi.):

20.0 mi.

Water Port:

Port Toledo

Distance (mi.):

60.0 mi.

Rail:

 Leipsic Community Rail connecting 3 rails (Norfolk Southern, CSXT and I&O)

Distance (mi.):

On Site

 

 

Siding:

On Site


Taxes/Incentives

District:

Leipsic LSD/Van Buren Township

Incentive Possible:        Enterprise Zone Area & Community Reinvestment Area

Yes

Real:

$50.60/$1000 @ 35%

 

 

 

None

 

 


Comments

The Site is owned by Leipsic and is a "Shovel Ready Site". It is annexed into the corporation, has a completed Phase 1 Environmental Study, within an Enterprise Zone and Community Reinvestment Area, zoned "heavy industrial" and serviced with all utilities (raw and potable water, sanitary sewer, natural gas and electric). 

Revised Date: 8/07/09

{Home} {Incentives} {Development Sites} {State Programs} {Port Authority} {Industrial Guide} {Map}